Laserfiche WebLink
• i <br />-3- <br />determined: <br />b) The Board will eater the lands to perform reclamation only if the Board has <br />nd been performed, and <br />i. that reclamation required by law to have been performed upon such lands has <br />u. that financial waranty forfeiture proceedings described in the Ad or similar <br />provisions of subsequent laws, if any, have been initiated, <br />c) The Division, acinrg for the Board, will eater lands to respond to an emergercy only <br />where the Division detemrines that any ofthe conditions of Construction Material Rule 8.4.2. exist. <br />~ The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />referarcz. <br />/ / a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />~HAEL B. <br />Division Director <br />