My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30370
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:06 PM
Creation date
11/21/2007 12:19:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Hydrology
Doc Date
5/29/2007
Doc Name
2nd Quarter 2007 Impoundment Inspection Report
From
WWC Engineering
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2007 Maintenance List <br />The Second Quarter 2007 Inspection was performed on May 18, 2007. All structures were functioning <br />as designed. Eight locations require repair. Culverts El and E12 and Terrace T10 need repair. Erosion <br />features at the intersection of the North Road and Lower Moffat Road need repair. Vegetation needs to <br />be cleared at the north embankment outlet of the West Ridge Pond. Check Dams 9, 10 and 11 have <br />bypass spillway erosion features that need repair. These repairs will be made in the 2007 season, along <br />with any other repairs identified during 2007 site inspections. <br />Repair <br />Item No. Location Work Description <br />1 EI Channel west of culvert will be repaired. <br />2 E12 Rock and sediment will be removed from culvert. <br />3 T10 Terrace will be repaired at West Ridge Road. <br />4 North Road Erosion will be repaired on North Road south of intersection with <br />Lower Moffat Road. <br />5 West Ridge Pond Vegetation will be cleared at north embankment on either side of <br />outlet. <br />6 CK9 Erosion features on both sides of spillway will be re aired. <br />7 CK10 Erosion features on both sides of spillway will be re aired. <br />8 CKl l Erosion features on both sides of spillway will be repaired. <br />
The URL can be used to link to this page
Your browser does not support the video tag.