Laserfiche WebLink
SECTION 3 -C <br />SCALE 1 " = 20' H &V <br />NOTES, SECTION 3 -C <br />1. SLOPE SURFACE OF DIVERSION CHANNEL <br />BACKFILL TO 2H:1V OR FLATTER. <br />2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br />AND REVEGETATE. <br />3. PLACE THE FILL IN APPROXIMATELY HORIZONAL <br />LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br />BY ROUTING THE CONSTRUCTION EQUIPMENT <br />UNIFORMLY OVER THE FILL SURFACE. <br />4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br />OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br />4. STABILITY ANALYSIS ARE PRESENTED IN DETAIL IN GEO —HYDRO <br />REPORT, VOLUME 6, OF THE PERMIT. <br />REbSED: 04116198 <br />FitECEIVE ! <br />APR 2 9 iS�3 <br />rmsion of Minerals & Geolo,/ <br />GA -5K <br />Illlii IIII VIII VIII VIII VIII IIII IIII <br />004292 <br />