Laserfiche WebLink
-3- <br />b) The Board will enter the lands to perform reclanation only if the Board has <br />detemrined: <br />i. that reclamation required by law to have been performed upon such lands has <br />not been perforned, and <br />ii. that fnrancial warranty forfeiture proccedargs described m the Ad or similar <br />provisiwu of subsequaU laws, if any, have bear initiated. <br />c) The Division, ailing for the Board, will arter ]ands to respond to an emergarcy only <br />where the Division detemvnes that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth m the attadred rider, if any, are incorporated herein by <br />refierarce. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />RONALD W. CATTANY <br />Division Director <br />