Laserfiche WebLink
B. The Crusher Plan : <br /> The crusher which will process the sand and gravel removed <br /> from the pit will be located near the actual cutting operations <br /> in Phase I as shown on the mining map, Exhibit "C" . In the <br /> event that the operator decides to move the location of the <br /> crusher, wash plant, settling pond, or other operation for <br /> convenience during Phase II or Phase III, a sketch plan of the <br /> proposed locations will be submitted to the Board for approval <br /> prior to the beginning of operations in such Phase. <br /> The crushing equipment generates a tolerable level of <br /> noise and, in any event, will at all times be within the <br /> confines of the Eagle River, the Denver & Rio Grande Railroad, <br /> and U. S. Highway 6 & 24 . <br /> C. Concrete and Asphalt Plants : <br /> Potential locations for concrete and asphalt plants are <br /> shown on the mining map, Exhibit "C" . However, the operator has <br /> no present plans for either type of operation. At some point in <br /> the future, it may become desirable to extend the site activities <br /> to include one or both of those operations . They may, however, <br /> be undertaken by someone other than Nottingham Sand & Gravel Co. <br /> In the event that Nottingham itself should wish to put an asphalt <br /> or concrete plant into operation, plans :ill be submitted to the <br /> board for approval and any necessary permits will be obtained. <br /> J <br />