My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978-12-07_PERMIT FILE - M1978352 (18)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1978352
>
1978-12-07_PERMIT FILE - M1978352 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 2:36:32 PM
Creation date
11/21/2007 12:16:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978352
IBM Index Class Name
Permit File
Doc Date
12/7/1978
Doc Name
112 Permit Application
From
Nottingham Sand & Gravel Co.
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "L" <br /> Reclamation Costs <br /> Operator estimates that the cost of sloping and of back- <br /> filling where necessary in the area disturbed during mining <br /> operations will be approximately $800 per 200 linear feet along <br /> the ridge of exposed surface of the cliff. We estimate the <br /> cost of seeding with the mixture specified in Exhibit "E" to be <br /> approximately $75 an acre, and fertilizer where feasible an <br /> additional $15 an acre. The operator does not anticipate any <br /> expense for any soil that may have to be hauled in to establish <br /> a seed bed; ample suitable soil should be available from the <br /> company' s Avon operation, and trucks will be moving between the <br /> two operations frequently. <br /> Therefore reclamation costs for each phase of the project <br /> should be as follows : <br /> Phase I <br /> Filling and Grading <br /> (approximately 1, 125 ft. ) 4 , 500 . 00 <br /> Seeding (8 . 90 acres) 667 . 50 <br /> Fertilizer (8 . 90 acres) 133 . 50 <br /> 5 , 301. 00 <br /> Phase II <br /> Filling and Grading <br /> (approximately 875 ft. ) 3, 500. 00 <br /> Seeding (6 . 62 acres) 496 . 50 <br /> Fertilizer (6 . 62 acres) 99 . 30 <br /> 4, 095 . 80 <br /> Phase III <br /> Filling and Grading <br /> (approximately 2 , 900 ft. ) 11, 600 . 00 <br /> Seeding (13. 34 acres) 1, 000. 50 <br /> Fertilizer (13. 34 acres) 200 . 10 <br /> 12 , 800 . 60 <br /> Total Cost 22 , 197. 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.