Laserfiche WebLink
TABLE L -1 <br />RIO GRANDE PORTLAND CEMENT <br />RECLAMATION COST ESTIMATE <br />DESCRIPTION MATERIAL DIMENSIONS (Ft) QUANTITY UNIT EIUNIT COST ($) <br />Gypsum receiving hopper and Conveyors Superstructure <br />Gypsam receiving hopper underground vault Concrete <br />3,000 S.T. Gypsum storage and Conveyor Superstructure <br />3,000 S.T. Gypsum storage and conveyor <br />undergrountl vault Concrete <br />Clinker and Gypsum bucket elevator Superstructure <br />Clinker and Gypsum bucket elevator Floor Concrete <br />Finish milt teetl bins and cement grintling Superstructure <br />Finish mill Peed bins and cement grintling Roor <br />Air slide conveyor <br />i X 10,000 S.T. cement storage and cement <br />bucket elevator <br />1 X 70,000 S T. cement storage and cement <br />bucket elevator Floor <br />Truck and rail loadout <br />Truck antl 2il loadout (loot <br />Raw recycle hin <br />Raw recycle bin floor <br />LS feed transfer point & Gammame[ric <br />LS teed transfer point & G concrete floor <br />Offica Construction <br />Office Floor <br />Concrete Disposal . <br />Superstructure Disposal <br />Demolish and RemoveASphalt <br />Revegetation <br />Concrete <br />Superstructure <br />Superstructure <br />Concrete <br />Superstructure <br />Concrete <br />Superstructure <br />Concrete <br />Superstructure <br />Concrete <br />Superstructure <br />Connote <br />Concrete <br />Soperstructure <br />Asphalt <br />Grading <br />Spread Topsail <br />Fertilize,Seed, Mulch <br />(6.6'75.5' 1)+(((7.4'36.9)/2)'32.8)+(29.5'13.1' i)+(243'6 6'3.3) <br />(40`29.5' 15}(23.6'23.6`11.5)+((95'6.6.3.3)-(95'5.6'2.3)) <br />((PIQ'(6 8^2))'19.7)+((1/3)`(PIQ'(34^2))'35.3)+(181'8,6'3.3)+(1'14.75.3) <br />(((1/3)'(PI(p(28^2))'23)-((113)'(PI(p(25"2))`23)+(14 7`16.4'5.3))+((123.711.5'8.3)+(1 <br />(((32`42'128)`2))+(((1/3)'2,5'(32`42))'2)+(22'108'295)a((1l3y(22'29.5)'2.5) <br />((32'42'1)`2)*((2.5'S'S)'4) <br />(82'8798)+(24.6'57108.3)+((1/3)'(81`57)'7.4)+((1131 (257)'7.4)+(24.6'24.6'49.2)- <br />(106.6'571)*((2.5'S`5)'12)+(24:6'24.6' 1) <br />(111'12.3'13.5) ' <br />(PIQ'(27^2)'211.6) <br />((PIQ'27"2)'i ) <br />(373761.5)+(((1/3)'(37"37)'(7.4)}12) <br />(37371) <br />49'39'98 <br />0.67'49'39 <br />32.8'49'24.6 <br />0.6732.8'24.6 <br />(((105'157.5)-(32 8'157 5))'26)+(((PI(}'92)'29.5)'0.6) <br />((105"157 5)-(32.8' 157.5))+((PIQ'92)'0.6) <br />Total of all concrete nibble <br />One-fourth of all superstructure <br />594' x 158' <br />1500' x 1500' x 12" <br />7500' x 1500' x 12" <br />1500'x 1500' <br />10,655 CF <br />12,140 CF <br />49,013 CF <br />15,599 CF <br />416,937 CF <br />2,938 CF <br />655,373 CF <br />7,431 CF <br />18,432 CF <br />484,611 CF <br />2.290 CF <br />85,882 CF <br />1,369 CF <br />187,278 GF <br />1,280 CF <br />39,537 CF <br />541 CF <br />300.775 CF <br />11,545 CF <br />169,47084 CF - <br />2.687,948.50 CF <br />93,852.00 SF <br />83,333 CY <br />83,333 LCY <br />51.7 ACRE ' <br />Subtotal <br />fns, ed, Profit <br />Eng. & Atlmin <br />PLANT SUBTOTAL <br />$0.12 $1,279 <br />$2.25 $27,316 <br />$0.12 $5,882 <br />$2.25 $35,098 <br />$0.72 $50,032 <br />$2.25 $6,671 <br />$O.t2 $78.645 <br />$2.25 $16,721 <br />$0.72 $2,212 <br />$0,12 $58,153 <br />$2.25 $5,153 <br />$O.t2 ~ $10,308 <br />$2.25 $3.080 <br />$0.12 $22,473 <br />$2.25 $2,887 <br />$0.12 $4,744 <br />$2.25 $1,216 <br />$0.12 ~ $36,093 <br />$2.25 $25,976 <br />$0.33 $55,925 <br />$0.37 $994,541 <br />$0.51 $47,865 <br />$0.26 $21,667 <br />$0.19 $15,633 <br />$945.00- $46,857 <br /> $2.924,930 <br />0.125 $365,616 <br />0.05 $146,247 <br />$3,436,793 <br />