HYDRO30309
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:03 PM
Creation date
11/21/2007 12:13:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
7/10/2006
Doc Name
June 2006 Monthly Report
From
Battle Mountain Resources Inc.
To
DMG
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 08, 2006 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />13I3 Sherman Street, Room Z15 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />e.JGne 2006 Monthly Report <br />Deaz Mr. Sorensen: <br />RE~Efi/ED <br />~UL 102006 <br />)~Divisiao o(Minerals and Geology <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of June 2006. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on June 28t4, no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells on June 28`4. June tailing impoundment <br />piezometer measurements identified these installations were either dry or contained less than 12 <br />inches of water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water <br />measurements collected for each of the site monitoring wells, piezometers and -ysimeters as <br />required by the terms and condition's of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrnin flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on June <br />28t4. The June tailings pond underdrain flow average was 47.88 gpm and a total of 830 gallons of <br />water was excavated from the leak detection system yielding a monthly average of 29.64 gpad. <br />During June the West Pit water treatment plant operated efficiently dischazging a total of <br />8,383,000 gallons (25.73 acre-feet) of water to Rito Seco Creek and a total of 1,018,900 gallons <br />(3.13 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 San Luis, Colorado 8 1 1 5 2-03 10 (719) 379-0798 Fax (719) 379-0713 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.