Laserfiche WebLink
[`iati~uu lc l'a "c i ~l. a i~ ..... d,: r.... <br />i <br />Post Mining <br />As with active mining, pli and oil and grease limitations apply co all <br />discharges regardless of precipitation conditions. Buc, for post-mining <br />dischatiges, Che settleable solids limitation applies unless exempted as <br />described above. Exemption is onl}' available wl+c+i discharge is caused by <br />precipitation greater than the 10-near, 24-bolo' event (or equivalent snowmelt <br />volume). <br />Example 2: The post-mining area served by pond and outfall 004 receives <br />snowmelt volume during ono 2-;-hour period las measured by continuous <br />influent recorder) grzatar ;:ban thr LO-ye:u, 24•hour equivalent voluue. <br />The pcrmitcee collects samples wliil~: inflow is occurring to the pond. 1'he <br />permictee submits the results along ~:it:h flu+o totalizer data and requests <br />an exemption Erow the settleable solids l.imitacion. .Upon acceptance of <br />the proof, the division still de [ermine cowpliance with Ure pH and oil and <br />grease limitations only. <br />snowmelt Freacer than 10-sear 24-hour event <br />Section 40 CFR 434.G3(d)(2) states that the exemption From '1'SS, co cal iron and <br />settleable solids limitations is :,vailal~le oi+1y Eor discharges "caused by <br />precipitation within any 24-hour period greater tl+an Che 10-year 24-hour <br />precipitation event (or snowir.zlt of equivalent volume)." Thus Eor snowmelt, <br />pond inflow volume must be grcateL' than tl~u 10-yzar, 24-hour even[ equivalent <br />volume (regardless of effluent volume). Thus, [he permitcee must be able to <br />submit documentation showing that tk~e total volume over a 24-hour period into a <br />pond is greater than the 10-year. 24-hour even[ equivalent volwne. Continuous <br />inflow volume monitoring is typically reyuirc:d Eor this demonstration. The <br />division allows this exemption for an addition:,) 4B hours co allow the pond [o <br />stabilize. <br />Ocher WOS-Based Parameters <br />Surface runoff discharges From coal mining Facilities are intermittent and <br />normally occur during periods whin receiving waters are well above lots flow. <br />The Colorado Mined Land Rzclamation Division and the State Engineers Office <br />typically require ponds to be dzwacered wicl+in 24 [0 3G hours after a storm <br />event. For these reasons no tdQS-based Liniite+tions ocher chair p11 are deemed <br />necessary ac this dine to protect inscreain beneficial uses. <br />Total Suspended Solids <br />The State Effluent Limitation Regulations dictate that cohere Federal EEFluenc <br />Guidelines exist they shall take precedence over SES. 1'l~is is the reason Eor <br />selection of BPT-based TSS limitations. <br />