Laserfiche WebLink
SEDCAD 4 for Windows <br />Copyright 1998 Pamela J. Schwab <br />Civil Solhvare Design <br />• <br />Structure #1 ~Pond1 <br />POND B-1 <br />Pond Inputs: <br />Structure Detai/: <br />Initial Pool Elev: 6,866.30 <br />IniOal Pool: 0.09 ac-k <br />*Sedrment Storage: 0.94 ac-k <br />Dead Space: 20.00 <br />`Sediment capacity based on Average Annual R of 30.0 for 5 year(s) <br />Broad-crested Weir <br />Weir Width Spillway Elev <br />(k) <br />0.25 6,866.30 <br />Emergency Spillway <br />Spillway Elev Crest Length Lek Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />• 6,867.40 20.00 3.00:1 3.00:1 8.00 <br />Pond Results: <br />Peak Elevation: 6,867.50 <br />H'graph Detention Time: 6.42 hrs <br />Pond Model: CSTRS <br />Dewater Time: 1.77 days <br />Trap Efficiency: 91.89 <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacit~Discharge Table <br />L <br /> <br />Elevation Area <br /> <br />(ac) ~ Capacity <br /> <br />(ac-ft) Discharge <br /> <br />(~s) Dewater <br />Tme <br />(hrs) <br />6,866.09 0.442 0.000 0.000 Top of Sed. Storage <br />6,866.30 0.457 0.094 0.000 Spillway#1 <br />6,666.50 0.471 0.187 0.069 16.25` <br />6,867.00 0.507 0.431 0.452 14.50 <br />6,867.40 0.533 0.639 0.890 9.55 Spillway #Z <br />6,867.50 0.540 0.693 2.401 <br />Filename: pondBl O-24A.sc4 <br />Printed 01-03-2000 <br />