Laserfiche WebLink
SEDCAD 4 for Windows <br />Copyright 1998 Pamela J. Schwab <br />Cavil Software Desgn <br />• <br />Structure #1 (Pond) <br />POND B-1 <br />Pond Inputs: <br />Structure Detai/; <br />Initial Pool Elev: 6,866.30 <br />Initial Pool: 1.03 ac-ft <br />Broad-crested Weir <br />Weir Width Spillway Elev <br />(R) <br />0.25 6,866.30 <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6,867.40 20.00 3.00:1 3.00:1 8.00 <br />• Pond Results: <br />Peak Elevation: 6,867.67 <br />Dewater Tme: 1.82 days <br />Dewateiing time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />• <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-ft) Discharge <br /> <br />(~s) Dewater <br />Tme <br />(hrs) <br />6,862.00 0.000 0.000 0.000 <br />6,862.50 0.023 0.004 0.000 <br />6,863.00 0.090 0.030 0.000 <br />6,863.50 0.165 0.093 0.000 <br />6,863.68 0.236 0.169 0.000 <br />6,864.00 0.249 0.198 0.000 <br />6,864.50 0.301 0.335 0.000 <br />6,865.00 0.359 0.500 0.000 <br />6,865.50 0.396 0.689 0.000 <br />6,866.00 0.435 0.896 0.000 <br />6,666.30 0.457 1.030 0.000 Spillway ttl <br />Filename: pondB26-24A.sc4 <br />Printed Ot-03-2000 <br />