Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2005 Monthly Report <br />Page 3 <br />Table 2 -September 2005 Tai-ing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (fr) Volume of <br />Water fr <br />P 12 9/28!05 41.66 41.71 0.05 <br />P 13 9/28/05 40.93 41.34 0.41 <br />P 14 9/28/05 D 41.24 0.00 <br />P 15 9/28/05 D 41.10 0.00 <br />Table 3 below provides the calendar year 2005 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Date <br />Date Quantity Sludge Management <br />March 2005 392.5 tons Sludge transferred from drying pad to tailings <br />impoundment. <br />May 2005 1275 tons Sludge pumped from Pond #3 to drying pad. <br />July 2005 127.5 tons Sludge transfen•ed from drying pad to tailings <br />impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />rely/~`~ <br />lio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />file <br />