Laserfiche WebLink
Acs <br />N rE-P <br />- {'roK^/ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />October 08, 2005 ~ y A v a ~ O q ~/ <br />~Mr. Allen Sorensen •J!/ <br />l6 State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. RECE~ v C~ <br />San Luis Project <br />cMLRBPermitN M-gs-llz ~ OCT 1 2 2005 <br />~/ rSeptember 2005 Monthly Report ~ Division of Minerela end Geolpgy <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of September 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(Q~QC) Plan. <br />Vacuum on the tailing lysimeters was veriFed on September 29's, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells were collected on September 28's. <br />September tailing impoundment piezometer measurements identified these installations were <br />either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />September 28a'. The September tailings pond underdrain flow average was 36.82 gpm and a total <br />of 910 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 26.76 gpad. <br />During September, the West Pit water treatment plant operated efficiently discharging a total of <br />8,459,400 gallons (25.96 acre-feet) of water to Rito Seco Creek and a total of 606,600 gallons <br />(1.86 acre-feet) of water was transfen•ed from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for September was 1.18" inches, with the largest accumulation <br />occurring on September, 22"d (0.42"). <br /> <br />P.O. Box 310 • San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />