My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30266
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:01 PM
Creation date
11/21/2007 12:10:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
10/12/2005
Doc Name
September 2005 Monthly Report
From
Battle Mountain Resources Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acs <br />N rE-P <br />- {'roK^/ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />October 08, 2005 ~ y A v a ~ O q ~/ <br />~Mr. Allen Sorensen •J!/ <br />l6 State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. RECE~ v C~ <br />San Luis Project <br />cMLRBPermitN M-gs-llz ~ OCT 1 2 2005 <br />~/ rSeptember 2005 Monthly Report ~ Division of Minerela end Geolpgy <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of September 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(Q~QC) Plan. <br />Vacuum on the tailing lysimeters was veriFed on September 29's, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells were collected on September 28's. <br />September tailing impoundment piezometer measurements identified these installations were <br />either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />September 28a'. The September tailings pond underdrain flow average was 36.82 gpm and a total <br />of 910 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 26.76 gpad. <br />During September, the West Pit water treatment plant operated efficiently discharging a total of <br />8,459,400 gallons (25.96 acre-feet) of water to Rito Seco Creek and a total of 606,600 gallons <br />(1.86 acre-feet) of water was transfen•ed from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for September was 1.18" inches, with the largest accumulation <br />occurring on September, 22"d (0.42"). <br /> <br />P.O. Box 310 • San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.