My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72187
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:42 PM
Creation date
11/21/2007 12:09:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
Rule 3 Performance Bond Requirements
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.13 CONTEMPORANEOUS RECLAMATION <br />All reclamation actives, including but not limited to backfilling, grading, topsoil, replacement <br />and revegetation, will be carried out as contemporaneously as practicable with mining <br />operations. Implementation of the reclamation plan, as described in Section 2.0.4, will <br />assure that each step in the reclamation process is completed in a timely manner. <br />Because of the multi-seam nature of the mining operation described in Section 2.05, <br />backfilling and grading cannot be completed within 180 days following the coal removal. <br />Backfilling and grading will be completed in variance of the 180 day requirement in a <br />manner previously approved and described below, and in Sections 2.05 and 4.14.1. As <br />shown on the mining Range Diagram (Map 24), mining will be carried out in any one area <br />for a considerable length of time. A series of benches will be necessary in the operation to <br />recover the lower coal seams, and an additional series of benches will be necessary to dump <br />the shovel/truck overburden material in a configuration that achieves the topography shown <br />on the post-mining Topography Map (Map 19). When multi-seams are mined, backfilling <br />and rough grading cannot begin until the lower-most seam is mined. See Spoil Grading Map <br />(Map 29), which shows the time frames in which grading will occur in relation to the time of <br />removal of "X" seam coal, which is shown on the Mine Plan Map (Map 23). <br />Topsoil will be removed prior to the mining disturbance according to the timetable <br />established on the Topsoil Handling -South Map (Map 28). As can be observed from this <br />map, the initial topsoil removed at the operation must be stockpiled; however, as the <br />operation progresses, topsoil can be immediately redistributed rather than stockpiled. <br />Revegetation will commence as soon as the topsoil has been redistributed and prepared for <br />seeding as described in Section 2.05.4. The area will be seeded with the seed mixture <br />described in Section 2.05.4 as quickly as possible. <br /> <br />4.13-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.