My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72187
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:42 PM
Creation date
11/21/2007 12:09:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
Rule 3 Performance Bond Requirements
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 4.08.2 Pre-Blastin~Survev <br />Upon request to the Division by a resident or owner of a dwelling or structure located within <br />one-half mile of any part of the permit area, Colowyo will promptly conduct apre-blasting <br />survey. A copy of correspondence advising our neighbors of this. opportunity is provided in <br />Exhibit 14 -Seismograph Measurements, Item 2. A report of the survey will be submitted to <br />the Division and to the person requesting the survey. The pre-blasting survey will assess the <br />condition of the structure or dwelling and document any pre-blasting damage, including any <br />physical factors which might be reasonably affected by blasting. Such a survey will <br />determine only the surface condition of pipes, cables, transmission lines, wells and other <br />water systems; however, special attention will be given to the pre-blasting conditions of wells <br />and other water systems used for human, animal or agricultural purposes and to the quantity <br />and quality of that water. <br />A written report of any pre-blasting survey will be prepared and signed by the person <br />conducting the survey. This report will include any proposed adjustments to the blasting <br />program which might be necessary to be incorporated or should be incorporated to prevent <br />damage. A copy of the report will be provided to the person requesting the survey and to the <br />Division. For properties owned by Colowyo, apre-blast survey will not be necessary. <br />[n a report dated February 19, 1991 Colowyo initiated and reported on a Building Condition <br />Inspection of the Durham Ranch. Although the Durham ranch was located further than one- <br />halfmile from the Permit Boundary at that time (approximately 4200 feet) the inspection was <br />nevertheless completed. The Durham Ranch residents were also presented with a copy of the <br />report. On May 20, 1997 an additional copy of the report was presented to the Durhams and <br />also a copy forwarded to the Division. A copy of the May 20, 1997 letter can be found in <br />Exhibit 14 -Seismograph Measurements. <br />4.08.3 Public Notice of Blastin¢ Schedule <br />The blasting program at the Colowyo operation will involve the detonation of more than five <br />pounds of explosives or blasting agent in all blasts. Colowyo will annually publish a blasting <br />schedule in the local Craig newspaper. Atypical blasting schedule published in the local <br />newspaper is set Forth in Section 2.05, Figure 1, Publication of Blasting Schedule. <br />Copies of the blasting schedule will be republished and redistributed every 12 months by <br />mail to local governments and public utilities and by mail or delivered to each residence <br />within one-half mile of the blasting site described in the schedule. <br /> <br />4.08-2 Revision Date: 9/20/02 <br />Revision No.: RN-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.