My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72187
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:42 PM
Creation date
11/21/2007 12:09:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
Rule 3 Performance Bond Requirements
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~• Groundwater/Alluvial Grounc•water - Ceic~+ye currently has txo <br />groundwater monitoring wells completed within Streeter Fiil, one <br />ai;uvial well competed in the Goodsprine Creek alTU•riun up- <br />stream from Streeter F1T1, and one alTUVial •xetT completed in the <br />Goodspring Creek alluvium at the base of Streeter Fill. Colo•.ryc <br />will conduct monitoring and sampling of the above four wells and <br />will install, monitor, and sample an additional weT] adjacent to <br />Wilson Creek. The proposed well location is down gradient from <br />the Gossard Loadout and will be completed during the summer of <br />1983. Estimates indicate the free water zone will be at <br />seventeen feet. The proposed well location is shown on Water <br />Monitoring Sites For Permit No. C-019-81 (1•lap 37) and proposed <br />well completion is shown in Figure 1. <br />In accordance with the September 29, 1982 "Proposed <br />Decision and Findings of Compliance For The Colowyo Coal Company <br />Colowyo Mine", all of the weirs will be sampled quarterly as <br />listed belox. <br />Q <br />d. <br />b. <br />c. <br />d. <br />f. <br />9• <br />• f. <br />k. <br />1. <br />m. <br />n. <br />o. <br />P- <br />U. <br />r. <br />s. <br />arterl Sa~~Ting For; <br />N <br />Conductivity at ZS~C <br />Total Dissolved Solids <br />Bicarbonate (NCO;} <br />Calcium (Ca+ } <br />Macnesium (Mg+2) <br />Am^:pia (NH3) <br />Nitrata <br />Phosphate ~PDq-3as P) <br />Sodium (Na ) <br />Sulfate (SDq) <br />Arsenic (AS) <br />Iron (Fe) <br />Lead (Pb) <br />Manganese (Mn) <br />Mercury (Ng) <br />Selenium (Se} <br />Zinc <br />Water level <br />Colowyo looks forward to continued cooperation with M.L.R.D. and <br />wilt consult with M.L.R.D., after the first annual report is submitted, in <br />efforts both tc evaluate the applicability of ati parameters chosen and <br />fre;uency of monitoring in accordance with the September 28, 1982 "Proposed <br />Decision and Findings of Compliance For The Colowyo Coal Company Colo•xyo <br />Mine"; and identify any peculiar site specific conditions. <br />Upon receipt of the Divisions approval of the ne••+ portions of the <br />above monitoring plans, Colowyo will implement the new provisions of the <br />plans. Since the new provisions were contempla*_ed in the Sepie::ber 28, <br /> <br />4.05-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.