My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72174
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:42 PM
Creation date
11/21/2007 12:09:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
4/11/2005
Doc Name
Adequacy Review 2
From
Civil Resources LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 17, 2005 <br />Mr. Bill Wallace, Attorney <br />C/o City of Fort Lupton <br />130 South McKinley Avenue <br />P.O. Box 148 <br />Fort Lupton, CO 80621 <br />RE: Legal Right To Enter and Consent for Conveyor Crossing, Reservoir Interconnect <br />and Pipeline for Recharge Wetls for Lupton Lakes Division of Minerals and Geology <br />Permit M-2004.078 <br />Dear Mr. Wallace: <br />As you are aware, the Division of Minerals and Geology (DMG) is currently reviewing the proposed <br />Lupton Lakes aggregate mining operation and water storage reservoir project. Per our discussion, <br />the DMG is requiring SW TKO Joint Venture Partnership, LLC (SW TKO) to include these locations <br />within the DMG permit boundary. The DMG is also requiring SW TKO to obtain proof that the Clty <br />will allow SW TKO to conduct the following: <br />1. Construct, operate and maintain covered conveyor crossings over Weld County Road <br />(WCR) 8 and WCR 6'/<. <br />2. Construct, operate and maintain a pipeline under WCR 8 to connect the two proposed <br />reservoirs. This will likely be located near the conveyor crossing locations. <br />3. Construct, operate and maintain the following pipelines to recharge nearby wells: 2 <br />pipeline crossings under WCR 27 and 1 pipeline crossing under WCR 6. <br />Please sign below, acknowledging that SW TKO has the legal right to conduct the above activities. <br />Thank you again for working with us on this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.