Laserfiche WebLink
L_• TABLE OF CONTENTS <br />l_ PURPOSE AND SCOPE OF STUDY <br />PROPOSED CONSTRUCTION 2 <br />SITE CONDITIONS 4 <br />SITE GEOLOGY 5 <br />SUBSURFACE CONDITIONS 8 <br />Lean Clay with Gravel (CL-GC) 9 <br />Bedrock ll <br />Ground Water 12 <br />Inclinometers 12 <br /> ENGINEERING ANALYSIS AND RECOMMENDATIONS 13 <br /> SITE GRADING 13 <br /> Site Preparation 13 <br /> Suitability of On-Site Soil 16 <br /> Select Fill 17 <br /> <br />• Embankment Shrink-Swell <br />Drainage 17 <br />17 <br /> Reclamation 18 <br /> FOUNDATIONS 18 <br /> Coal Loadout Silo, Stoker Bin 19 <br /> Water Tank 19 <br /> Downhill Conveyor 20 <br /> Building Foundations 21 <br /> General Drilled Pier Criteria 21 <br /> General Spread Footing Criteria 23 <br /> FLOOR SLABS 24 <br /> FOUNDATION AND RETAINING WALLS 26 <br /> UNDERDRAIN SYSTEM 28 <br /> SITE DRAINAGE 28 <br /> PAVEMENTS 29 <br /> Subgrade Soils 30 <br /> Design Traffic 30 <br /> Recommended Pavement Thickness 30 <br /> Subgrade Preparation 32 <br /> Drainage 32 <br /> POND CONSTRUCTION 33 <br /> CONTINUING SERVICES 33 <br />• LIIvIITATIONS 34 <br />