Laserfiche WebLink
_ W~~Iand~Sua s~e/orrJe~ ~~~ ~~~~~~~~~~~~~ ~~~ <br />January, 11 2002 <br />~l~ /D1 d~ -isrfl <br />RECEIVED <br />JAN 1 4 2pp2 <br />Greg Squire <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Deaz Greg, <br />Division of Minerals and Geology <br />envivmrrYar support rar; <br />• rY~rQportatbn <br />• Lard Dsvetrrpmsrrt <br />M~~ry <br />• ~~ <br />The reclamation cost worksheet that we previously for the Bonser Pit submitted was <br />incorrect. I have made changes to Overburden replacement, Liner Construction, <br />Dewatering and Indirect costs. I have based my changes on unit costs given in a bond <br />worksheet prepared by the Division for the R&O pit (M-99-092). The reclamation tasks <br />of the R&O pit are similar to Bonser and the bond calculated by the division came out to <br />$5,505.68 per acre. I have included the R&O Reclamation cost summary form for your <br />reference. The per acre cost of Bonser in the revised worksheet comes out to $5,551.35 <br />per acre. <br />I apologize for submitting this information incorrectly with our original application. <br />Sincerely, <br />P.~,, <br />Peter Wayland <br />President <br />10395 W. Colfax. SWte 350. Lakewood CO 8D215 <br />ph 303-I35-0951 fax 3D3-436-0953 <br />