Laserfiche WebLink
TABLE OF CONTENTS <br />' <br /> V. MINE SURFACE FACILITIES RECLAMATION PLAN ................................................... ..............V-1 <br /> V.A Water Quantity and Quality Control Plan ........................................................... ..............V-1 <br /> V.A.1 Water Quantity Control Plan ................................................................. ..............V-1 <br /> V.A.2 Water Quality Control Plan ................................................................... ..............V~ <br /> V.B Design, Construcion and Operation of Ponds and Waste Banks ...................... ..............V-5 <br /> V.B.1 General ................................................................................................. ..............V-5 <br /> V.B.2 Dewatering Mechanics .......................................................................... ..............V-5 <br /> V.B.3 Disposal Site Characteristics ................................................................ ..............Y-8 <br /> V.B.4 Sedimentation Ponds Design ................................................................ ..............V-9 <br /> V.B.S Waste Banks Design ............................................................................. ............V-14 <br /> V.B.6 Post Reclamation Sediment Control ..................................................... ............V-16 <br /> V.C Diversions .......................................................................................................... ............V-17 <br /> V.D Storage and Disposal of Acid-Forming, Toxio-FOnning and Combustible <br /> Materials ............................................................................................................. ............ V-18 <br /> V.E Disposal of Mine Development Waste ............................................................... ............V-19 <br /> V.F Sealing of Mine Openings and Drill Holes ......................................................... ............V-19 <br /> V.G Backfilling and Contouring ................................................................................. ............V-23 <br /> V.G.1 Revegetation Study with Various Topsoil Depths ................................. ............V-24 <br /> V.H Removal, Storage and Redistribution of Topsoil ............................................... ............V-25 <br /> V.I Revegetation ...................................................................................................... ............V-33 <br /> V.1.1 Introduction ........................................................................................... ............ V-33 <br /> V.1.2 General Specifications and Environmental Limitations ......................... ............V-36 <br /> V.1.3 Phases and Timing ............................................................................... ............V-36 <br /> V.1.4 Site Preparation Techniques and Materials .......................................... ............V-39 <br /> V.1.4.a Seed Selection ......................................................................... ............V-39 <br /> V.1.4.b Fertilizer ................................................................................... ............V~1 <br /> V.1.4.c Mulch ........................................................................................ ............V-42 <br /> V.1.4.d Seedbed Preparation ............................................................... ............V-02 <br /> V.1.4.e Seeding Operations ................................................................ .............V-43 <br /> V.1.4.f Planting Time ........................................................................... ............V~3 <br /> V.1.4.g Evaluation and Follow-up ........................................................ .............V-49 <br /> V.1.4.h Riparian Revegetation ............................................................ .............V~9 <br /> V.1.4.i Remedial Treatment of Refuse Area 1 ................................... .............V-52 <br /> V.J Determination of Revegetation Success ........................................................... .............V-55 <br /> V.J.1 Introduction .......................................................................................... .............V-55 <br /> V.J.2 Revegetation Success Criteria ............................................................. .............V-56 <br /> V.J.3 Sampling Methodology for Determining Revegetation Success .......... .............VAS <br /> V.J.4 Literature Cited (Sections I and J) ....................................................... .............V-86 <br /> V.K Reclamation Cost Estimate ............................................................................... .............V-67 <br /> V.L Weed Management ........................................................................................... .............V-67 <br /> <br />(Permit Renewal #3, Rev. 3/00) <br />