Laserfiche WebLink
I ~ Bonding summary <br />The Hond Calculation information pxesentad above demonstrates that the Loadout area can be <br />reclaimed for $975,761, A new surety of $113, 641 was attached to the previous bond <br />amount of $862,120 in May 2003 to cover tha liability increase identified by CDMG during <br />the RN-03 permit renewal adequacy review. With the May 2003 bond increase, the CDMG <br />currently holds $975,761 in reclamation bonds for the Loadout facility. Salvage value was <br />not included for any of the structures even though a scrap steel dealer would probably pay <br />for much of the salvageable steel. The railroad rail antl wooden ties were assumed to be <br />dismantled and loaded off site. <br />Hond estimate revisions calculated by CDMG as part of TR-06 will be reviewed by HGTI and <br />inserted into th® permit application package as appropriate. <br /> <br /> <br />TR-O6 9 Revised OS/OS <br />