Laserfiche WebLink
KB10_8 02 <br /> <br />Talpac <br />Haulage System: Haulage System-1 <br />Haul Cycle: E81 to East Buzzard (4,224 cyds) <br />Ma[erial: (PRJ] Topsoil <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHrlYear 1,957.50 <br /> Operating Shifts per Year shifts/Year 261.00 <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 2,614.57 <br /> Production per Shift bcy 19,609 <br /> Production per Year bcy 5,118,030 <br /> ait Time er O eratin Hour min 5.98 <br /> Availability % 92.25 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHrlYear 1,805.79 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 708.56 <br /> Production per Shift bcy 4,902 <br /> Production per Year bcy 1,279,507 <br /> Average Queue Time at Loader min/cycle 0.09 <br /> Average Spat Time at loader min/cycle 0.00 <br /> Average Loading Time min/cycle 0.50 <br /> Average Travel Time minlcycle 0.76 <br /> Average Spot Time at Dump min/cycle 0.20 <br /> Average Dump Time min/cycle 0.50 <br /> Average Cycle Time min/cycle 2.06 <br /> Fleet Size 4 <br /> Average No. of Bucket Passes 1.00 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodolog <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br />Average for 100 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br />1 <br />Trapper Mining <br />10-Oct-2002 11:47 AM Page 1 <br />