Laserfiche WebLink
r~ <br />KB10_8_02 <br />Talpac <br />Haulage System: Haulage System-1 <br />Haul Cycle: Wt32 to West Buzzard (1,580 cyds) <br />Material: (PRJJ Topsoil <br />Rnetnr• !PR_tl 5 r/nv Wank _ R Nnur .Chiifc <br />• <br />Availability % 100.00 <br />Average Bucket Volume cu.yards 38.02 <br />Bucket Fill Factor 0.72 <br />Average Payload bcy 25.00 <br />Operating Hours per Year OpHrlYear 1,957.50 <br />Operating Shifts per Year shiftslYear 261.00 <br />Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour bcy 2,444.26 <br />Production per Shift bcy 18,332 <br />Production per Year bcy 4,784,648 <br />Wait Tim r O eratin Hour min .35 <br />Availability % 92.50 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,810.69 <br />Average Payload bcy 25.00 <br />Production per Operating Hour bcy 660.61 <br />Production per Shift bcy 4,583 <br />Production per Year bcy 1,196,162 <br />Average Queue Time at Loader min/cycle 0.08 <br />Average Spot Time at loader min/cycle 0.00 <br />Average Loading Time min/cycle 0.50 <br />Average Travel Time min/cycle 0.92 <br />Average Spot Time at Dump minlcycle 0.20 <br />Average Dump Time min/cycle 0.50 <br />Average Cycle Time min/cycle 2.21 <br />Fleet Size 4 <br />Average No. of Bucket Passes 1.00 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodolo5 <br />Discounted Operating Cost $/bcy 0.00 Single Sided <br />Discounted Average Cost $/bcy 0.00 Full Truck <br /> Average for 100 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the firsf bucket pass coincides with the Truck queueing and maneuvering times. <br />• <br />Trapper Mining <br />10-Oct-2002 12:28 PM Page 1 <br />