Laserfiche WebLink
<br />KB10_8 02 <br />Talpac <br />Haulage System: Haulage System-1 <br />Haul Cycle: WCt to BC Road- Fnd to Powder Magazine <br />Material: ~PRJ] Topsoil <br />Rester lPRJI .5 day Week - R Hour Shifts <br /> <br />Availability % 100.00 <br />Average Bucket Volume cu,yards 38.02 <br />Bucket Fill Factor 0.72 <br />Average Payload bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,957.50 <br />Operating Shifts per Year shifts/Year 261.00 <br />Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour bcy 1,285.96 <br />Production per Shift bcy 9,645 <br />Production per Year bcy 2,517,274 <br />Wail Time er O eratin Her min 31.67 <br />Availability % 91.84 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,797.81 <br />Average Payload bcy 25.00 <br />Production per Operating Hour bcy 175.02 <br />Production per Shift bcy 1,206 <br />Production per Year bcy 314,659 <br />Average Queue Time at Loader min/cycle 0.17 <br />Average Spot Time at loader min/cycle 0.00 <br />Average Loatling Time min/cycle 0.50 <br />Average Travel Time min/cycle 6.91 <br />Average Spot Time at Dump min/cycle 0.20 <br />Average Dump Time min/cycle 0.50 <br />Average Cycle Time min/cycle 8.27 <br />Fleet Size 8 <br />Average No. of Bucket Passes 1.00 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodolol <br />Discounted Operating Cost $/bcy 0.00 Single Sided <br />Discounted Average Cost $/bcy 0.00 Full Truck <br /> Average for 95 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle, <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br /> <br />Trapper Mining <br />22-Oct-2002 2:03 PM Page 1 <br />