Laserfiche WebLink
KB10_8_02 <br />• <br />Talpac <br />Haulage System: Haulage System-1 <br />Haul Cycle: WC1 to East Buzzard South (3,485 cyds) <br />Material: (PRJ] Topsoil <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 <br /> Operating Shifts per Year shifts/Year 261.00 <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 1,046.17 <br /> Production per Shift bcy 7,846 <br /> Production per Year bcy 2,047,882 <br /> Wait Time er O eratin Hour min 36.15 <br /> Availability % 91.71 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,795.23 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 142.59 <br /> Production per Shift bcy 981 <br /> Production per Year bcy 255,985 <br /> Average Oueue Time at Loader min/cycle 0.14 <br /> Average Spot Time at loader min/cycle 0.00 <br /> Average Loading Time min/cycle 0.50 <br /> Average Travel Time minlcycle 8.78 <br /> Average Spot Time at Dump min/cycle 0.20 <br /> Average Dump Time min/cycle 0.50 <br /> Average Cycle Time min/cycle 10.12 <br /> Fleet Size 8 <br /> Average No, of Bucket Passes 1.00 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodo/ol <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br />Average for 95 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br />• <br />Trapper Mining <br />22-Oct-2002 2:05 PM Page 1 <br />• <br />• <br />• <br />