Laserfiche WebLink
KB10_8_02 <br /> <br />Haulage System: Haulage System-1 <br />Haul Cycle: WC1 to East Buzzard North (3,900 cyds) <br />Material: (PRJ] Topsoil <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 <br /> Operating Shifts per Year shifts/Year 261.00 <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 966.08 <br /> Production per Shift bcy 7,246 <br /> Production per Year bcy 1,891,098 <br /> Wait Time er O eratin Hour min 37.64 <br /> Availability % 91.84 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,797.81 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 131.49 <br /> Production per Shift bcy 906 <br /> Production per Year bcy 236,387 <br /> Average Queue Time at Loatler min/cycle 0.14 <br /> Average Spot Time at loader min/cycle 0.00 <br /> Average Loading Time min/cycle 0.50 <br /> Average Travel Time min/cycle 9.63 <br /> Average Spot Time at Dump min/cycle 0.20 <br /> Average Dump Time minlcycle 0.50 <br /> Average Cycle Time minlcycle 10.97 <br /> Fleet Size 8 <br /> Average No. of Bucket Passes 1.00 <br /> Discounted Capital Cost $Ibcy 0.00 Loading Methodolo <br /> Discounted Operating Cost $Ibcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br />Average for 95 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br /> <br />Talpac <br />Trapper Mining <br />22-Oct•2002 2:04 PM Page 1 <br />