Laserfiche WebLink
KB10_8_02 <br /> <br />Talpac <br />Haulage System: Haulage System-1 <br />Haul Cycle: WC1 to West Buzzard (18,260 cyds) <br />Material: (PRJ] Topsoil <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHrlYear 1,957.50 <br /> Operating Shifts per Year shifts/Year 261.00 <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 885.88 <br /> Production per Shift bcy 6,644 <br /> Production per Year bcy 1,734,107 <br /> W it Tim er O rati Hour min 39.05 <br /> Availability % 92.37 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHrlYear 1,808.11 <br /> Average Payload <br />Production per Operating Hour bcy <br />bcy 25.00 <br />119.88 <br /> Production per Shift bcy 831 <br /> Production per Year bcy 216,763 <br /> Average Queue Time at Loader min/cycle 0.13 <br /> Average Spot Time at loader min/cycle 0.00 <br /> Average Loading Time min/cycle 0.50 <br /> Average Travel Time min/cycle 10.70 <br /> Average Spot Time at Dump minlcycle 0.20 <br /> Average Dump Time min/cycle 0.50 <br /> Average Cycle Time min/cycle 12.03 <br /> Fleet Size 8 <br /> Average No. of Bucket Passes 1.00 <br /> Discounted Capital Cost $Ibcy 0.00 Loading Mefhodo/ol <br /> Discounted Operating Cost $Ibcy 0.00 Single Sitled <br /> Discounted Average Cost $Ibcy 0.00 Full Truck <br />Average for 95 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br />• <br />Trapper Mining <br />22-Oct-2002 12:00 PM Page 1 <br />• <br />• <br />n <br />U <br />