Laserfiche WebLink
\J <br />KB70_8_02 <br />Talpac <br />Haulage System: Haulage System-1 <br />Haul Cycle: WB3 to West Buzzard (1,124 cyds) <br />Material; (PRJJ Topsoil <br />Rncfar- fPR. n 5 rlav Waok _ R Hnur Rhiffc <br /> <br />Availability % 100.00 <br />Average Bucket Volume cu.yards 38.02 <br />Bucket Fill Factor 0.72 <br />Average Payload bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,957.50 <br />Operating Shifts per Year shifts/Year 261.00 <br />Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour bcy 2,558.65 <br />Production per Shift bcy 19,190 <br />Production per Year bcy 5,008,555 <br />Wait Time er O eratin Hour min 7.08 <br />Availability % 93.75 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,835.16 <br />Average Payload bcy 25.00 <br />Production per Operating Hcur bcy 682.31 <br />Production per Shift bcy 4,797 <br />Production per Year bcy 1,252,139 <br />Average Queue Time at Loader min/cycle 0.09 <br />Average Spot Time at loader min/cycle 0.00 <br />Average Loading Time min/cycle 0.50 <br />Average Travel Time min/cycle 0.85 <br />Average Spot Time at Dump min/cycle 0.20 <br />Average Dump Time min/cycle 0.50 <br />Average Cycle Time min/cycle 2.14 <br />Fleet Size 4 <br />Average No. of Bucket Passes 1.00 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodolog <br />Discounted Operating Cost $/bcy 0.00 Single Sided <br />Discounted Average Cost $/bcy 0.00 Full Truck <br /> Average for 100 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br /> <br />Trapper Mining <br />10-Oct-2002 11:49 AM Page 1 <br />