Laserfiche WebLink
<br /> <br /> <br />KB10_8_02 <br />Haulage Sys[em: <br />Haut Cycte: <br />Material: <br />Haulage System-1 <br />EM1 to BC Road <br />(PRJ] Topsoil <br />!PR_n 5 rlav WPPk - <br />7alpac <br /> <br />Availability % 100.00 <br />Average Bucket Volume cu.yards 38.02 <br />Bucket Fiil Factor 0.72 <br />Average Payload bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,957.50 <br />Operating Shifts per Year shifts/Year 261.00 <br />Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour bcy 2,696.63 <br />Production per Shift bcy 20,225 <br />Production per Year bcy 5,278,653 <br />Wait Time er O eratin Hour min 4.35 <br />Availability % 92.00 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,800.90 <br />Average Payload bcy 25.00 <br />Production per Operating Hour bcy 732.78 <br />Production per Shift bcy 5,056 <br />Production per Year bcy 1,319,663 <br />Average Queue Time at Loader min/cycle 0.12 <br />Average Spot Time at loader min/cycle 0.00 <br />Average Loading Time min/cycle 0.50 <br />Average Travel Time min/cycle 0.67 <br />Average Spot Time at Dump min/cycle 0.20 <br />Average Dump Time min/cycle 0.50 <br />Average Cycle Time min/cycle 1.99 <br />Fleet Size 4 <br />Average No. of Bucket Passes 1.00 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodolog <br />Discounted Operating Cost $/bcy 0.00 Single Sided <br />Discounted Average Cost $/bcy 0.00 Full Truck <br /> Average for 100 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br />Trapper Mining <br />10-Oct-2002 11:35 AM Page 1 <br />