Laserfiche WebLink
C~ <br /> <br />KB10_8_02 <br />Haulage System: <br />Haul Cycle: <br />Material: <br />Availability <br />Average Bucket Volume <br />Bucket Fill Factor <br />Average Payload <br />Operating Hours per Year <br />Operating Shifts per Year <br />Average Bucket Cycle Time <br />Production per Operating Hour <br />Production per Shift <br />Production per Year <br />Availability <br />Payload in Template <br />Operating Hours per Year <br />Average Payload <br />Production per Operating Hour <br />Production per Shift <br />Production per Year <br />Average Queue Time at Loader <br />Average Spot Time at loader <br />Average Loading Time <br />Average Travel Time <br />Average Spot Time ai Dump <br />Average Dump Time <br />Average Cycle Time <br />Fleet Size <br />Average No. of Bucket Passes <br />Discounted Capital Cost <br />Discounted Operating Cost <br />Discounted Average Cost <br />cu.yards <br />bcy <br />OpHr/Year <br />shifts/Year <br />min <br />bcy <br />bcy <br />bcy <br />bcy <br />OpHr/Year <br />bcy <br />bcy <br />bcy <br />bcy <br />min/cycle <br />min/cycle <br />min/cycle <br />minlcycle <br />min/cycle <br />min/cycle <br />min/cycle <br />Talpac <br />Haulage System-1 <br />CG1 to Coyote (18,309 cyds) <br />(PRJ] Topsoil <br />100.00 <br />38.02 <br />0.72 <br />25.00 <br />1,957.50 <br />261.00 <br />0.50 <br />2,478.75 <br />18,591 <br />4,852,149 <br />92.11 <br />25.00 <br />1,802.96 <br />25.00 <br />336.40 <br />2,324 <br />606,519 <br />0.29 <br />0.00 <br />0.50 <br />2.83 <br />0.20 <br />0.50 <br />4.32 <br />8 <br />1.00 <br />$Ibcy 0.00 Loading Methodolo <br />$/bcy 0.00 Single Sided <br />$/bcy 0.00 Full Truck <br />Average for 95 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br />u <br />Trapper Mining <br />10-Oct-2002 11:38 AM Page 1 <br />