Laserfiche WebLink
KB10_S_02 <br />• <br />Talpac <br />Haulage Sys[em: Haulage System-1 <br />Haul Cycle: A77-1 to BC Anfo/Emulsion (12,944 cyds) <br />Material; (PRJ] Topsoil <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 <br /> Operating Shifts per Year shifts/Year 261.00 <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 2,554.67 <br /> Production per Shift bcy 19,160 <br /> Production per Year bcy 5,000,761 <br /> Wait Tim er O eratin Hour min 7.10 <br /> Availability % 93.47 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHrlYear 1,829.75 <br />® Average Payload <br />Production per Operating Hour bcy <br />bcy 25.00 <br />546.61 <br /> Production per Shift bcy 3,632 <br /> Production per Year bcy 1,000,152 <br /> Average Queue Time at Loader min/cycle 0.16 <br /> Average Spot Time at loader min/cycle 0.00 <br /> Average Loading Time min/cycle 0.50 <br /> Average Travel Time min/cycle 1.31 <br /> Average Spot Time at Dump min/cycle 0.20 <br /> Average Dump Time minlcycle 0.50 <br /> Average Cycle Time min/cycle 2.67 <br /> Fleet Size 5 <br /> Average No. of Bucket Passes 1.00 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodolol <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br />Average for 95 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br /> <br />Trapper Mining <br />10-Oct-2002 11:40 AM Page 1 <br />