Laserfiche WebLink
KB10_8_02 <br /> <br />Talpac <br />Haulage System: Haulage System-7 <br />Haul Cycle: FS1 to BC Anfo/Emulsion (550 cyds] <br />Material: (PRJ] Topsoil <br />Rnc~cr fPR n 5 rlav Wnu4 _ R Hnnr Shiftc <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 <br /> Operating Shifts per Year shifts/Year 261.00 <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 2,762.49 <br /> Production per Shift bcy 20,719 <br /> Production per Year bcy 5,407,570 <br /> Wait Time er eratin Hour min 6 <br /> Availability % 92.25 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,805.79 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 748.64 <br /> Production per Shift bcy 5,180 <br /> Production per Year bcy 1,351,892 <br /> Average Queue Time at Loader min/cycle 0.18 <br /> Average Spot Time at loader minlcycle 0.00 <br /> Average Loading Time min/cycle 0.50 <br /> Average Travel Time min/cycle 0.57 <br /> Average Spot Time at Dump min/cycle 0.20 <br /> Average Dump Time min/cycle 0.50 <br /> Average Cycle Time min/cycle 1.95 <br /> Fleet Size 4 <br /> Average No. of Bucket Passes 1.00 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodolog <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br />Average for 100 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the Truck queueing and maneuvering times. <br /> <br />Trapper Mining <br />10-Oct-2002 11:45 AM Page 1 <br />