Laserfiche WebLink
.. f- <br />Mr. Joe Tom Wood Page 4 <br />Green/Croissant M2001-022 <br />August 7, 2003 <br />Loveland Ready Mix -Green/Croissant Pit (DMG #M-07-022) <br />MONTHLY DISTRIBUTION FOR DEPLETION AND REPLACEMENT <br />REQUIREMENTS <br />2003 <br />(All values in Acre-Feet) <br /> <br /> <br />Month <br /> <br />Evaporative <br />Depletions <br />Water Lost <br />With Mined <br />Product <br />Water <br />Lost for <br />Dust <br />Control <br />Water Lost <br />In Concrete <br />Batching Total <br />Replacement <br />Requirement <br />(Lagged) <br />City of Loveland <br />Lease Water <br />Janua 1.10 0.06 0.03 0.37 2.50 2.55 <br />Februa 1.37 0.14 0.03 0.37 1.96 2.00 <br />March 1.65 0.25 0.08 0.37 2.18 2.22 <br />A ril 2.88 0.40 0.08 0.46 2.41 2.46 <br />Ma 3.43 0.40 0.15 0.46 3.18 3.24 <br />June 5.08 0.40 0.18 0.74 3.91 3.98 <br />Jul 5.63 0.40 0.23 0.74 5.19 5.29 <br />Au ust 5.22 0.26 0.23 0.64 5.87 5.98 <br />Se tember 3.57 0.26 0.23 0.64 5.69 5.80 <br />October 2.47 0.18 0.15 0.64 5.23 5.33 <br />November 1.24 0.14 0.08 0.55 4.14 4.22 <br />December 0.96 0.06 0.03 0.46 3.23 3.29 <br />Total 34.64 2.95 1.50 6.44 45.49 46.39 <br />Note: RiverTransit Loss is 1.85 percent from the Loveland wastewatertreatment plant to the <br />site per Water Commissioner <br />