Laserfiche WebLink
MINE INFLOW STUDY <br />~3 MINE <br />SNOWMASS COAL COMPANY <br />11/22/83 <br />6/27/84 <br />4REA SOURCE FLOW <br />GPM TEMP <br />°C COND <br />UMHOS pH <br />SU FLOW <br />- GPM TEMP <br />°C COND <br />UMHOS pH <br />SU <br />1 Roof Bolt Holes .25 7.5 1050 7.6 1.0 12.0 1280 8.1 <br />2 Roof (Fault ~.l 5.8 1160 7.7 < .10 11.5 1350 7.8 <br />3 Roof Bolt Holes .25 8.9 1160 7.9 1.5 13.2 1440 7.9 <br />4 Coal Floor Interface <.O1 - - - DRIED UP <br />5 Roof Fall .5 6.5 1560 7.7 1.0 9.4 1355 7.8 <br />6 Roof Bolt Holes .1 6.2 1260 7.5 5.0 13.0 1175 7.6 <br />7 Fault - Roof Bolt Holes 5.0 ~ 7.0 1510 7.0 35.0 13.2 1350 7.3 <br />8 Roof Bolt Holes 35.0 11.0 1630 6.7 50.0 13.6 740 7.2 <br />Total Mine Inflow = 93.6 GPM <br />Total Mine Discharge = 110 GPM <br />Total Consumption = 0 GPM <br />• <br /> <br />