Laserfiche WebLink
SNOWMASS COAL COMPANY <br />NINE INFLOW STUDY <br />~1 MINE <br />• June 10, 1985 (*) 8 July 20, 1985 <br /> <br />Area <br />Source Flow <br />GPM Temp <br />°C Cond <br />umhos cm <br />SiMf <br />*13A Gob 3.0 12.2 1250 7.6 <br />*14 Roof Bolt Holes 2,5 12.5 $75 7,g <br />*15 Gob 5.0 12.5 900 7,7 <br />*16 Roof Bolt Holes 8,5 12.8 •.925 7 4 <br />*17 Gob 8 Roof Bolt Holes 7,5 12.2 1050 7,4 <br />*i8 FToor 8 Rib (Fault) 30,0 12.1 1100 7 4 <br />*i9 Roof Bolt Holes 1.0 12.6 1200 7,3 <br />*20 Roof Bolt Holes 3,0 12.5 750 7,g <br />~- <br />Total Mine Inflow = 190.5 GPM <br />Total Mine Discharge = 196.7 GPM <br />Consumption = 0 GPM <br /> <br /> <br />