My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71984
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:26 PM
Creation date
11/21/2007 12:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Air Quality Permit Application & Impact Analysis
Section_Exhibit Name
Tab 22 Attachment 22-1B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Departrnent of Public Health and $nvironment <br />Air Pollution Confrol Division <br />- MINING OPERATIONS - <br />• GENERAL INSTRUCTIONS FOR <br />FUGITIVE PARTICULATE AIR POLLUTANT EMISSION NOTICE /CONTROL PLAN <br />Complete only those sections of this form which are applicable to your operation. All data given, such as <br />production rates, topsoil removal, etc., should be for that period of 12 months that is expected to have the <br />greatest amount of activity, usually for the first year. Emrsstons will be calculated in terms ofpounds per day <br />and tons per year of particulates generated. Also, please submit the following, if available: <br />A map showing site location and boundaries, haul roads, and nearby residences or commercial <br />structures. <br />2. Production schedule. <br />Schematic of the operation. <br />4. Engineering or manufacturing data on control equipment. <br />PERMITS REQUIRED <br />Fugitive Particulate Emission Permits are issued for site-specific activities, such as mining, storage of <br />materials, haul road activities, etc. <br />The Division will use the information submitted on this form to estimate emissions from the activity. <br />Any processing equipment, such as a crusher, screen, concrete batch plant, or asphalt plant is considered to be <br />portable and requires a separate permit application, Air Pollution Emtsston Notice, and filing fee. <br />• This aids the applicant by requiring only a revised Air Pollution Emission Notice for Relocation, whenever the <br />equipment is moved to a new site. <br />FEES <br />A filing fee of $119.96 shall accompany each Air Pollution Emission Notice /Control Plan filed with a permit <br />application. Permit processing fees will be chazged for the amount of time the Division spends evaluaring the <br />permit application. These fees, (currently $59.98 per hour) plus any required public notice fees, must be paid <br />before an Imrial Approval Permit wilt be issued. Once the project has commenced operation, the source has <br />180 days to certify compliance with the permit conditions. Once the source has self-certified, Final Approval <br />processing will begin. Final Approval Permit processing fees must be paid before the Final Approval Permit is <br />issued. <br />For more information or assistance call: <br />Small Business Assistance Proeram <br />(303)692-3148 <br />Sma11 Business Ombudsman <br />(303)692-2135 <br />n <br />~I <br />Revised September 2004 htm://wwvv.edohestate co.us/ap/stationary.asn <br />
The URL can be used to link to this page
Your browser does not support the video tag.