Laserfiche WebLink
Review Checklist for Pond Inspection Reports <br />Pond inspection period: 4`n quarter 2005 <br />Mine :Edna <br />CDMG permit no.: C-1980-001 <br />Date review completed: December 20, 2005 / <br />CDMG reviewer: Byron G. Walker ~,,,/ <br /> Require- <br /> <br />Requirement Requirement ment <br />complied <br />Comment <br /> citation with ? <br /> es/no <br />Quarterly reports <br />Timely submittal of CDMG regulation PAP, page 4.6-138 (no time <br />quarterly pond inspection 4.05.9(17) yes specified). Required by Mar 31, <br />report 2006, received December 19, 2005 <br />Qualified inspector CDMG regulation <br />4.05.9(17) yes Accomplished by Chris Miller <br />Content of quarterly report <br />(structural weakness, other CDMG regulation <br />YeS) Repairs to check dams had been <br /> <br />hazardous conditions) 4.05.9(17) accomplished. All were reported as ok. <br />cc: Dan Hernandez (e-mail) <br />