Laserfiche WebLink
BASIN RESOURCES, INC. <br />StEDIMENTATION POND INSPECTION FORM r <br />Pond_~y~p ~s'4~ ~/14 Lf NPDES lio._ OOJ <br />l Date of Inspection 6-,~d-9y <br />EMBANI(MENT <br />i. Adequacy of the vegetative cover: xcelle 'Moderate, Yew, Poc <br />2. Erosion forcing gullies: Ertensive, Sons, Very Yew, (~o <br />3. Ia wave action causing erosion: <br />On the upstream embankment? Yee No ~/ <br />At the principal spillway inlet? Yea No c. <br />4. Erosion of the downstream toe of the enbsnkment7 Yes Nom <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No / If y <br />could this seepage cease potential instability? Yea No ri <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Ia the principal spillway system in working order? Tes / !fo_ <br />2. Is the inlet free of debris and restrictive mstesial7Tes vl~o <br />3. is the dischnrge outlet !rN of restrictive naterialt Tss ~/Ilo_ <br />4. Is erosion occurring at the discharge outlet? Tas 110 /7! <br />yes, <br />evalunte the severity: Extensive 1loderate Jost starting <br />EMERGENCY SPILLMAY .' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yes / No <br />2. Does it appear as if the amergency'spillway has discharged Ovate <br />since the last inspection? Yes Ilo / <br />3. Is erosion occ~~ ring at any section of the emergency spillway? <br />Yea No~ Describe the: <br />extent . <br />SEDIMENT STORAGE CAPACITY <br />i. Haa the design torage capacity of the reservoir been surpassed <br />Yea No ~ If yes, <br />explain: <br />Please add sny special convents concerning potentially dangerous <br />problems on the beck o! thls sheet. <br />Inspector~~ _ ' ~ <br />~_ <br />i • . <br />