Laserfiche WebLink
~~ ~ III IIIIIIIIIIIIIIII <br />999 <br />ECG NECA <br />s Coa,Company Seneca Coal Company <br />RECEIVED <br />MAR 0 g 2000 <br />Division of Minerals & Geology <br />March 7, 2000 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Yoast Mine <br />Dear Mr. Boulay: <br />Enclosed is the fourth quarter inspection reports for Ponds 010, <br />011, and 012 at the Yoast Mine. The as-built report for pond 012 <br />is currently being prepared and will be forwarded shortly to the <br />Division for inclusion in the permit package. Conditions <br />appeared stable and acceptable. <br />If you have any questions, please call me. <br />Sincerely <br />Michael o'le,ltavill~,~, .E. <br />Engineeri "O ~,,.~~~~ <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />MAR 0 7 2000 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FN((970) 276-3014 <br />