Laserfiche WebLink
$USURBAN SAND AND GRAVEL <br />ROAD RUNNERS REST II <br />TABLE Cz levised oc~o~r <br />WATER LOST WITH GRAVEL <br />MONTHS PERCENT <br />RETAINED <br />IN GRAVEL TONNAGE <br />PRODUCED CUBIC FT OF <br />WATER BY <br />WEIGHT TOTAL <br />(AC-FT) TOTAL <br />(AC-IN) <br /> <br />JAN 2$ 5,000 6,d10 0.15 1.77 <br />FEB 2$ 5,000 6,410 0.15 1.77 <br />MARCH 2$ 5,000 6,410 0.15 1.77 <br />APRIL 10$ 25,000 32,051 0.74 8.83 <br />MAY 11$ 27,500 35,256 0.81 9.71 <br />JUNE 20$ 50,000 64,103 1.47 17.66 <br />JULY 20$ 50,000 64,103 1.47 17.66 <br />AUGUST 12$ 30,000 38,462 0.68 10.60 <br />SEPT 10$ 25,000 32,051 0.74 8.83 <br />OCT 7$ 17,500 22,436 0.52 6.18 <br />NOV 2$ 5,000 6,410 0.15 1.77 <br />DEC 2$ 5,000 6,410 0.15 1.77 <br /> 100$ 250,000 320,512 7.36 88.32 <br />NOTE: <br />1/ PROPORTIONAL YEARLY PRODUCTION <br />2/ COLUMN 1 TIMES YEARLY PRODUCTION <br />3/ FORMULA: (TONNAGEI*(4$1*(2000 #/TONIa CUBIC FT. <br />62.4 #/CU-FT. <br />4/ COLUMN 3 + 43560 CU-FT/AC-FT <br />5/ COLUMN 4 TIMES 12 IN/FT <br />