My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71841
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:17 PM
Creation date
11/20/2007 11:59:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
3/2/1989
Doc Name
MINE DESIGN SECTORS STABILITY REPORT
Section_Exhibit Name
EXHIBIT D FIGURE 11
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />O O O <br />/ o O O <br />� m <br />I N <br />W <br />W <br />/ <br />If 07) 10 <br />WS <br />asn r <br />� \ r <br />1 li i / ` J II _ <br />! WES7 ORE ZONE <br />t <br />I w 3 aKw. <br />I � <br />SfC0 <br />t <br />o SOO 1000 FT BATTLE MTN. GOLD CO <br />T MINE DI <br />STEFFEN ROBERTSON E <br />v <br />C <br />O C <br />O O <br />O <br />Or 0 <br />v O <br />O N <br />W <br />+ + N 216 000 <br />Per t tuber, 4 ,� <br />Class ennd <br />i Class ❑Revision <br />Type /Seq _� L <br />O rt Hydro OGenerel <br />Class O Repo- <br />i <br />ooc Type -- - - - - - -- -- 0- <br />DAppliwtion (Coal only) Bond ❑ Entor ment O Inspenbon <br />.s I <br />�-- •i -- �. --�-- N 210000 <br />"L RITO .-NECO <br />SAN LUIS PROJECT DATE SEPT 1988 <br />PRO1 VO <br />14701 <br />APPROVED <br />=CTORS <br />NO <br />I I <br />Consulting Engineers <br />ICI, III�IIIIIIIII1I�IINI�N3IIIIIIII8I <br />0 <br />E <br />u <br />a <br />tr <br />ty <br />tr <br />�1 <br />; <br />e <br />e <br />0 <br />Id <br />u <br />r• <br />0 <br />n <br />I <br />c <br />u <br />0 <br />. <br />r <br />r <br />I <br />_ <br />4� <br />i <br />C <br />O C <br />O O <br />O <br />Or 0 <br />v O <br />O N <br />W <br />+ + N 216 000 <br />Per t tuber, 4 ,� <br />Class ennd <br />i Class ❑Revision <br />Type /Seq _� L <br />O rt Hydro OGenerel <br />Class O Repo- <br />i <br />ooc Type -- - - - - - -- -- 0- <br />DAppliwtion (Coal only) Bond ❑ Entor ment O Inspenbon <br />.s I <br />�-- •i -- �. --�-- N 210000 <br />"L RITO .-NECO <br />SAN LUIS PROJECT DATE SEPT 1988 <br />PRO1 VO <br />14701 <br />APPROVED <br />=CTORS <br />NO <br />I I <br />Consulting Engineers <br />ICI, III�IIIIIIIII1I�IINI�N3IIIIIIII8I <br />0 <br />E <br />u <br />a <br />tr <br />ty <br />tr <br />�1 <br />; <br />e <br />e <br />0 <br />Id <br />u <br />r• <br />0 <br />n <br />I <br />c <br />u <br />0 <br />. <br />r <br />C <br />O C <br />O O <br />O <br />Or 0 <br />v O <br />O N <br />W <br />+ + N 216 000 <br />Per t tuber, 4 ,� <br />Class ennd <br />i Class ❑Revision <br />Type /Seq _� L <br />O rt Hydro OGenerel <br />Class O Repo- <br />i <br />ooc Type -- - - - - - -- -- 0- <br />DAppliwtion (Coal only) Bond ❑ Entor ment O Inspenbon <br />.s I <br />�-- •i -- �. --�-- N 210000 <br />"L RITO .-NECO <br />SAN LUIS PROJECT DATE SEPT 1988 <br />PRO1 VO <br />14701 <br />APPROVED <br />=CTORS <br />NO <br />I I <br />Consulting Engineers <br />ICI, III�IIIIIIIII1I�IINI�N3IIIIIIII8I <br />0 <br />E <br />u <br />a <br />tr <br />ty <br />tr <br />�1 <br />; <br />e <br />e <br />0 <br />Id <br />u <br />r• <br />0 <br />n <br />I <br />c <br />u <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.