Laserfiche WebLink
QUARTERLY INSPECTION REPORT <br />~ SEDIMENT PONDS <br />PAine: GOLDEN EAGLE <br />Date: 10/3/85 3RD QUARTER <br />Pond No.: 002 OUT OF SERVICE <br />Monitoring procedures and instrumentation: <br />VISUAL INSPECTION <br />WALKED AROUND POND <br />Design depth and elevation of impounded water: _ <br />NOT APPLICABLE <br />Existing storage capacity: <br />0% <br />Fires in construction material: <br />NONE <br />~.. <br />Stability: <br />EMBANKMENT IS SOUND ~ '' b' <br />P°~,~' <br />Observations: <br />POND NEEDS TO BE CLEANED AND HOLES PLUGGED <br />BEFORE RECEIVING MINE WATER DISCHARGE. <br />114aintenance needs: <br />EC~w~~ <br />INSPECTED by: <br />~~ <br />