Laserfiche WebLink
Jeffrey A. Clark <br />Page 4 <br />Division 1 Water Court at least three (3) years prior to the ~ <br />not be limited to, long-term evaporation losses and lagged <br />after reclamation, replacement of lagged depletions from n <br />until there is no longer an effect on stream flow. <br />11. The decision of the State Engineer shall have no precedential or <br />create any presumptions, shift the burden of proof, or serve as a <br />case or any other legal action that may be initiated concerning th <br />This decision shall not bind the State Engineer to act in a similar <br />applications involving other plans or in any proposed renewal of <br />concurrence with any findings of fact or conclusions of law conta <br />engineering methodologies used by the Applicant. <br />August 29, 2007 <br />of mining, to include, but <br />~. If a lined pond results <br />dewatering shall continue <br />videntiary force, shall not <br />efense in any water court <br />substitute water supply plan. <br />canner in any other <br />is plan, and shall not imply <br />ed herein, or with the <br />Please contact Joanna Williams in Denver at (303) 866-3581, or Dave Nettles in Greeley at <br />(970) 352-8712, if you have any questions concerning this approval. , <br />Sincerely, <br />~I~ <br />Kevin Rein, P.E. <br />Chief of Water Supply <br />Attachments <br />KR/JMW: Bromley Lakes 2007 SWSP.doc <br />cc: Dave Nettles, Assistant Division Engineer <br />Bob Stahl, Water Commissioner District 2 <br />Division of Reclamation, Mining, and Safety <br />