My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71764
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:01 PM
Creation date
11/20/2007 11:57:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
EMF, FPC & ASTRO II PRINTOUTS
Section_Exhibit Name
Tab 23 ATTACHMENT 23-3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I January 15, 1996 <br />Dozing <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />del D10N Ident [PUSH COAL ] Hourly O&O [ 196.29] <br />Blade Type ( UNIV.] Dual Tilt [ 100] <br />Dozing Distance (feet) [ 400] Spoil Pile Factor ( 100] <br />Operator [ 75] Minutes Worked per Hour [ 45] <br />Grade [ 0] Bank Material Density [ 2,157] <br />Material Factor [ 75] Loose Material Density [ 1,601] <br />Dozing Factor [ 100] Coefficient of Traction [ 60] <br />Visibility [ 100] Direct Drive Transmission [ 100] <br />Altitude [ 100] Bank cu yds to Move [ 22,000] <br />Theoretical Production"Under Ideal Conditions (Loose cu yd/h) 502 <br />Total Adjustment Factor 0.6085 <br />Adjusted Hourly Production Estimate (Bank cu yd/h) 227 <br />Adjusted Hourly Production Estimate (Loose cu yd/h) 306 <br />Operating Hours to Complete Job 96 <br />Equipment Expense to Move Required Volume $ 18,843 <br />Equipment Expense per Bank Cubic Yard $ 0.8565 <br />L_.J <br /> <br />23-3 -31 REVISED 01/30/96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.