Laserfiche WebLink
15, 1996 <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />I~~el D10N Ident [GRD SPUR ] Hourly O&O [ 196.29], <br />Blade Type <br />Dozing Distance (feet) <br />Operator <br />Grade <br />Material Factor <br />Dozing Factor <br />Visibility <br />Altitude <br />[ UNIV.] Dual Tilt <br />[ 100] Spoil Pile Factor <br />[ 75] Minutes Worked per Hour <br />[ -10] Bank Material Density <br />[ 100] Loose Material Density <br />[ I00] Coefficient of Traction <br />[ 100] Direct Drive Transmission <br />[ 100] Bank cu yds to Move <br />[ 100] <br />[ 100]; <br />[ 45] <br />[ 3,202] <br />[ 2,545] <br />[ 100] <br />[ 100] <br />80,000] <br />Theoretical Production Under Ideal Conditions (Loose cu yd/h) <br />Total Adjustment Factor <br />Adjusted Hourly Production Estimate (Bank cu yd/h) <br />Adjusted Hourly Production Estimate (Loose cu yd/h) <br />Operating Hours to Complete Job <br />Equipment Expense to Move Required Volume $ <br />Equipment Expense per Bank Cubic Yard $ <br />1,766 <br />0.6177 <br />867 <br />1,091 <br />92 <br />18,058 <br />0.2257 <br /> <br />• <br />23-3-23 REVISED 01/30/96 <br />