Laserfiche WebLink
January 15, 1996 <br />(Dozing <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />del D10N Ident [GRD LOOP ] Hourly 0&O [ 196.29] <br />Blade Type [ UNIV.] Dual Tilt [ 100] <br />Dozing Distance (feet) [ 200] Spoil Pile Factor [ 100] <br />Operator ( 75] Minutes Worked per Hour [ 45] <br />Grade [ -10] Bank Material Density [ 3,202] <br />Material Factor [ 100] Loose Material Density [ 2,545] <br />Dozing Factor [ 100] Coefficient of Traction [ 100] <br />Visibility [ 100] Direct Drive Transmission [ 100] <br />Altitude [ 100] Bank cu yds to Move [ 64,000] <br />Theoretical Production Under Ideal Conditions (Loose cu yd/h) <br />Total Adjustment Factor <br />Adjusted Hourly Production Estimate (Bank cu yd/h) <br />Adjusted Hourly Production Estimate (Loose cu yd/h) <br />Operating Hours to Complete Job <br />Equipment Expense to Move Required Volume $ <br />Equipment Expense per Bank Cubic Yard $ <br />942 <br />0.6177 <br />462 <br />582 <br />138 <br />27,088 <br />0.4233 <br /> <br />• <br />23-3-21 <br />REVISED 01/30/96 <br />