My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71759
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:01 PM
Creation date
11/20/2007 11:57:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001052
IBM Index Class Name
Permit File
Doc Date
7/25/2001
Doc Name
FILE M-2001-052 MCCORMICK PIT 112C DECISION LETTER FINANCIAL AND PERFORMANCE WARRANTY REQUEST CONSTR
From
DNG
To
GRASSER CONSTRUCTION INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• • <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task t< : 001 <br />Date : 07/10/2001 <br />User : BMK <br />State :Colorado <br />County :Kit Carson <br />Site : Mccormick Pit <br />Agency or organization name : DMG <br />Permit or other jab action :new permit <br />Task description :lOUgh g! <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.67 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op. cosUhour : $4.89 50 <br />Operator cosUhour : $27.99 NA <br />Total unit cosVhour : $149.81 Total fleet cosUhour : $149.81 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 32,850 LCY factor: NA <br />Source of estimated volume : EXIBIT D <br />Source of estimated swell factor : NA <br />PermiVjobk : M-2001-052 <br />Abbreviation :none <br />Filename : M052-001 <br />Loose <br />volume : 32,850 LCY <br />HOURLY PRODUCTION <br />Average push distance : 300 feet <br />Unadjusted hourly production : 314.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 1.00 % (neg) <br />Average site altitude : 4,300 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />Ea Rh -Loam <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.576 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.20 (slot) <br />Visibility : 1.00 (avg.) <br />Job efficiency: 0.83 ()shilf/daf <br />Spoil pile : 0.90 (ssd-/c) <br />Push gradient : 1.02 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.10 (Cat HB) <br />Blade type : 1.00 (S/SU/UJ <br />Net correction : 0.83 <br />Adjusted unit production : 260.27 LCY/hr <br />Adjusted fleet production : 260.27 LCY/hr <br />Total job time : 126.22 Hours <br />Total job cost : $18,909 <br />
The URL can be used to link to this page
Your browser does not support the video tag.