Laserfiche WebLink
P&M will proceed with implementation of corrective measures depending upon <br />the nature of the actions required. For corrective measures that involve <br />non-designed structures, or the repair of designed structures without <br />design modification, work will not require CDMG approval before it is <br />undertaken, because it is considered routine maintenance. For corrective <br />measures that require construction or modification of designed structures, <br />application for the appropriate permit revision will be submitted for CDMG <br />review and approval. Corrective measures will be undertaken in accordance <br />with the schedule established in the revision package. In the event that <br />corrective actions or measures (routine maintenance or designed structures) <br />can not be completed within the projected completion schedule, P&M and the <br />CDMG will establish a mutually acceptable revised schedule for their <br />completion. <br />Technical Revision 40 4.3-22 March 25, 2003 <br />