Laserfiche WebLink
3M-TDR WELL WORK 10-SEPT 2004 & 15-SEPT 2004 <br />10 Sept. 2004 <br />Rig up work over rig. Run 3-1/8 inch bit into well. Tag cement @ 1650 feet. Drill <br />through cement and drop through @ 1655 feet. Clean out well to 1824 feet. Pull out of <br />well. Rig down. <br />15 Sept. 2004 <br />Rig up Well Serv electric line service. Log well: temperature, collazs, and cement bond <br />log. Could not get tools below 1786 feet due to debris in well. No visible collar shifting <br />from previous log. Bottom hole temperature came down 50 degrees from previous <br />temperature log. <br />