Laserfiche WebLink
t <br />CG~O[L'.CC GcPiu~:?I°?i'i VF ii%~1LT1{, Water Quality Control Division <br />Renawai Permit Rationale Page 2. Permit No.: COG-850000. <br />II. Permit Changes (continued) <br />BMP's also include treatment requirements, operating procedures, and <br />practices to control plant site runoff, spillage or leaks, sludge or <br />waste disposal, or drainage from raw material, intermediate and finished <br />product storage. Pollution prevention (incorporating waste minimization) <br />is an essential part of best management practices. The permittee must <br />look at all phases of Che operation to determine what changes could be <br />made that would result in a lower consumption and/or disposal of <br />pollution-generating materials, as well as minimizing e:cposure of <br />pollutants to stormwater. Such efforts often result in greater profit to <br />the permittee and less pollution of the environment. <br />The mechanism for implementation of stormwater BMP requirements within <br />this permit shall be the stormwater Management Plan (SWMP). <br />The permittee will be required to develop and implement a SWMP plan. <br />Some activities required under this plan may already be in place, <br />However, the SWMP plan will require the permittee Co coordinate these <br />activities with any necessary new activities in an orderly manner so chat <br />the result is the reduction or elimination of pollutants reaching state <br />waters from areas rot limited by effluent limitations. An added benefit <br />may be a reduction of pollution reaching other media, such as the air or <br />hazardous waste disposal sites. In fact, the permittee is encouraged to <br />srrive for tkiis overall goal. Where the reduction of water pollution <br />only results in the increased pollution of ocher media, there is no net <br />benefit to the environment. <br />The permittees certified under this permit shall be required co submit a <br />SWMP to the Division for review within six months from the date Che <br />certification is issued. The requirements of the plan do not specify the <br />exact pollution control facilities that the permittee must construct. <br />Instead, the plan allows for creativity on the permittee's part, as long <br />as the goal is achieved. Each permittee will need to determine what <br />controls are necessary at the specific site. Then, the permittee will <br />need to develop a plan for the Cimely execution of these controls. Where <br />construction is necessary, the plan shall include a sc!tedule detailing <br />the milestones involved with such construction. As necessary, elements <br />of the plan may require prior approval from Che CMIRD. <br />The plan shall include a statement signed by cop management in which they <br />affirm that compliance with Che plan shall occur. Also, it shall provide <br />for updates where there is a change in operation chat will or may result <br />in a change in Che quality of pollutants addressed by this plan, or if <br />[he plan is shown to be ineffective in achieving the specified goals. <br />The plan, once submitted, will be incorporated into the permit and its <br />implementation will be considered a permit requirement. Failure to do so <br />could result in enforcement action. The plan shall remain in effect as <br />long as the facility is regulated by a GDPS permit. The permittee will <br />be expected to certify on a yearly basis chaC the plan is being <br />implemented as required. <br />